Yıldız Entegre Aslanbey
Yıldız Entegre Aslanbey · Düzce, Turkey

A 32 MW biomass energy plant installed at Yıldız Entegre's facility in Düzce, Turkey.

Location
Düzce, Turkey
Year
2012
Capacity
32 MW
Fuel
Biomass (Wood Chips, Sawdust, Bark)

About the client

Yıldız Entegre is an industrial wood processing company based in Düzce, Turkey. The company operates continuous manufacturing processes with high demand for reliable thermal energy solutions.

EPC and engineering scope

Bersey undertook the EPC and engineering scope for turnkey delivery of the energy facility. Engineering services, system design and integration were addressed in line with the client's process requirements and operating conditions. The scope brought together the use of production residues as an energy source, the design of systems to meet applicable environmental requirements, and the work required for turnkey delivery.

Plant design

The plant is designed for wood waste combustion from production processes. 21 MW Thermal Oil, 2x12 TPH Steam, 11 MW Hot Gas MDF Dryer, ESP Filter.

Scope of supply

  • Moving Floor Fuel Silo
  • Fuel Conveyor and Bunker
  • Oversize Fuel Separator
  • Bersey Combustion Stepgrate
  • Refractory in-lined Combustion Chamber
  • Combustion Air & Gas Recirculation System
  • Ash Cooling & Extraction System
  • Radiation & Convection Heaters
  • Automatic Retractable Soot Blowers
  • Steel Structures, Platforms and Stairs
  • Electrical System & PLC Control Unit
  • Refractory Application
  • Piping & Ducting
  • Flue Gas System & ESP Filter
  • Pumps Stations & Collectors
  • Emergency Coolers

Energy system capacities

  • 21 MW Thermal Oil
  • 2x12 TPH Steam
  • 11 MW Hot Gas MDF Dryer
  • ESP Filter