Pinskdrev Plywood

Pinskdrev Plywood
Pinskdrev Plywood · Pinsk, Belarus

A 2x27 MW biomass energy plant for Pinskdrev, the largest plywood and furniture producer in Belarus.

Location
Pinsk, Belarus
Year
2020
Capacity
2x27 MW
Fuel
Biomass (Wood Chips, Sawdust, Bark)

About the client

Pinskdrev is a leading Belarusian woodworking and furniture holding founded in 1880 in Pinsk. Starting from small woodworking workshops, the company developed into an integrated manufacturer of furniture, plywood, veneer, timber, and related products. After major destruction during World War II, Pinskdrev was rebuilt and modernized, expanding its production and export activities throughout the Soviet period. Following restructuring and privatization in the 1990s, the company adopted a holding structure and invested heavily in modern technologies. By 2012, Pinskdrev operated 31 production units, employed over 6,800 people, and exported to more than 130 countries, making it one of the region's largest integrated woodworking and furniture producers.

EPC and engineering scope

Bersey undertook the EPC and engineering scope for turnkey delivery of the energy facility. Engineering services, system design and integration were addressed in line with the client's process requirements and operating conditions. The scope brought together the use of production residues as an energy source, the design of systems to meet applicable environmental requirements, and the work required for turnkey delivery.

Plant design

The plant is designed for 228,000 ton/year of wood waste combustion from Plywood production. The plant saves ~128,000 ton/year of CO₂.

Scope of supply

  • Moving Floor Fuel Silo
  • Fuel Conveyor and Bunker
  • Oversize Fuel Separator
  • Bersey Combustion Stepgrate
  • Refractory in-lined Combustion Chamber
  • Combustion Air & Gas Recirculation System
  • Ash Cooling & Extraction System
  • Radiation & Convection Heaters
  • Automatic Retractable Soot Blowers
  • Steel Structures, Platforms and Stairs
  • Electrical System & PLC Control Unit
  • Refractory Application
  • Piping & Ducting
  • Flue Gas System & Bagfilters with 20 mg/Nm³
  • Pumps Stations & Collectors
  • Triple Stage Water Preparation System
  • Indirect Steam Generators
  • Emergency Coolers

Energy system capacities

  • 2 x 28 MW Combustion Chamber
  • 2 x 45 m² Combustion Grate
  • 2 x 21 MW Thermal Oil Heater
  • 2 x 19 TPH Steam Generator @ 10bar
  • 2 x 3 MW Waste Heat Water Economizer