BERSEY

Kastamonu Entegre Gebze

Kastamonu Entegre Gebze
Kastamonu Entegre Gebze · Gebze, Turkey

A 11 MW biomass energy plant installed at Kastamonu Entegre's facility in Gebze, Turkey.

Location
Gebze, Turkey
Year
2006
Capacity
11 MW
Fuel
Biomass (Wood Dust, Sawdust)

About the client

Kastamonu Entegre is an industrial wood processing company based in Gebze, Turkey. The company operates continuous manufacturing processes with high demand for reliable thermal energy solutions.

EPC and engineering scope

Bersey undertook the EPC and engineering scope for turnkey delivery of the energy facility. Engineering services, system design and integration were addressed in line with the client's process requirements and operating conditions. The scope brought together the use of production residues as an energy source, the design of systems to meet applicable environmental requirements, and the work required for turnkey delivery.

Plant design

The plant is designed for wood waste combustion from production processes. 8.25 MW Thermal Oil, 10 MW Sanderdust Burner, Multicyclone.

Scope of supply

  • Moving Floor Fuel Silo
  • Fuel Conveyor and Bunker
  • Oversize Fuel Separator
  • Bersey Combustion Stepgrate
  • Refractory in-lined Combustion Chamber
  • Combustion Air & Gas Recirculation System
  • Ash Cooling & Extraction System
  • Radiation & Convection Heaters
  • Automatic Retractable Soot Blowers
  • Steel Structures, Platforms and Stairs
  • Electrical System & PLC Control Unit
  • Refractory Application
  • Piping & Ducting
  • Flue Gas System & Multicyclone Filters
  • Pumps Stations & Collectors
  • Emergency Coolers

Energy system capacities

  • 8.25 MW Thermal Oil
  • 10 MW Sanderdust Burner
  • Multicyclone
Contact us about a similar projectProject Stories