BERSEY

AFK Kemerovo

AFK Kemerovo
AFK Kemerovo · Kemerovo, Russia

A 2x21 MW biomass energy plant installed at AFK Kemerovo's facility in Kemerovo, Russia.

Location
Kemerovo, Russia
Year
2009
Capacity
2x21 MW
Fuel
Biomass (Wood Chips, Sawdust)

About the client

AFK Kemerovo is an industrial wood processing company based in Kemerovo, Russia. The company operates continuous manufacturing processes with high demand for reliable thermal energy solutions.

EPC and engineering scope

Bersey undertook the EPC and engineering scope for turnkey delivery of the energy facility. Engineering services, system design and integration were addressed in line with the client's process requirements and operating conditions. The scope brought together the use of production residues as an energy source, the design of systems to meet applicable environmental requirements, and the work required for turnkey delivery.

Plant design

The plant is designed for wood waste combustion from production processes. 2x15 MW Thermal Oil, 2x8 TPH Steam, 2x6 TPH Hot Water.

Scope of supply

  • Moving Floor Fuel Silo
  • Fuel Conveyor and Bunker
  • Oversize Fuel Separator
  • Bersey Combustion Stepgrate
  • Refractory in-lined Combustion Chamber
  • Combustion Air & Gas Recirculation System
  • Ash Cooling & Extraction System
  • Radiation & Convection Heaters
  • Automatic Retractable Soot Blowers
  • Steel Structures, Platforms and Stairs
  • Electrical System & PLC Control Unit
  • Refractory Application
  • Piping & Ducting
  • Flue Gas System & Emission Control System
  • Pumps Stations & Collectors
  • Emergency Coolers

Energy system capacities

  • 2x15 MW Thermal Oil
  • 2x8 TPH Steam
  • 2x6 TPH Hot Water
Contact us about a similar projectProject Stories